|
|
|
Rail-Runner system for electrolytic nickel and chrome,
|
Full-length oscillation |
Electrolytic bussing is bent and formed |
Horizontal e-stop bumpers |
Transport cage is provided |
Chrome tank |
Power track and robotic |
Multi-hoist systems are equipped |
Computer menus status the operator with critical cycle parameters. Menus can be customized for each application and critical data displayed. Network compatible. All systems are completely PC controlled. Software maintenance, service, upgrades and modifications can be performed remotely via modem |

Carts feed the load/unload queue,
keeping operators from working
near a moving hoist. Red/green
beacons signal the operator to
exchange the carts